Rinnai RIN250EHP Installation And Owner's Manual page 6

Electric heat pump
Table of Contents

Advertisement

Transport and Handling
Critical: When moving the unit,
it must be close to vertical at
all times.
When using a trolley to move
the unit, ensure it is not
tilted more than 45° from the
vertical.
Non-compliance will void
warranty and severely affect
product performance and
operation.
Step 1
• Arrive at site and conduct a safety
audit.
• Safety audits can also be known as
Work Method Statements (WMS) or
Job Site Analysis (JSA).
• Park your vehicle as close as
allowable to your installation.
• Unload all materials in a safe manner.
• Position all materials in a convenient
position near the work area.
• The existing tank (if applicable)
should be drained and removed in a
responsible manner.
4
Installation Instructions
Installation and Owner's Manual – Heat Pump
H4123
Never tilt unit more than
45˚ from vertical
Note: Do not commence
a job where the risks
cannot be controlled.
Note: Do not drain on to
grass or garden beds.
025961
Rev. A
July 2012

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents