Geh Clearance Dimensions; Geh 1/2 Through 5 Ton Clearance; Geh 6 Through 15 Ton Clearance - Trane Axiom GEHB 006 Installation, Operation And Maintenance Manual

Horizontal/vertical water-source comfort system
Table of Contents

Advertisement

GEH Clearance
Dimensions
Access to the unit for service
purposes should be provided at
installation. All 1/2 through 5 ton
configurations require an 18" (457
mm) surround clearance from other
mechanical and electrical equipment
(where shown) to enable panel
removal from the unit for service/
maintenance ability. Some local
codes require a greater service
clearance than listed below. Check all
code requirements prior to unit
installations.
Equipment containing a same-side
supply/return combination requires
a 3" (229 mm) limitation on one side.
Access to the TXV may not be
possible with this 3" (229 mm)
clearance. This configuration is
typically applied in a corridor
installation, where space limitations
force the left or right side of the unit
against a wall.
Service clearance dimensions for the
6 through 15 ton horizontal includes
a two side access appropriate for
control and blower motor/wheel
access. Some local codes require a
greater service clearance than listed
below. Check all code requirements
prior to unit installations.
WSHP-SVX01E-EN
Dimensions
18" (457)
(4-SIDES)
LEFT RETURN
BACK SUPPLY
UNIT FRONT
18" (457)
(4-SIDES)
RIGHT RETURN
BACK SUPPLY
UNIT FRONT
Figure 3.

GEH 1/2 through 5 ton clearance

36"
(914)
SERVICE
CLEARANCE
20"
(508)
SERVICE
CLEARANCE
Figure 4.

GEH 6 through 15 ton clearance

18" (457)
(4-SIDES)
LEFT RETURN
RIGHT SUPPLY
UNIT FRONT
18" (457)
(4-SIDES)
RIGHT RETURN
LEFT SUPPLY
UNIT FRONT
TOP VIEW
BLOWER ACCESS
PANEL
18" (457)
(3-SIDES)
LEFT RETURN
LEFT SUPPLY
3"
(76)
UNIT FRONT
18" (457)
(3-SIDES)
RIGHT RETURN
RIGHT SUPPLY
3"
(76)
UNIT FRONT
9