Chapter 3: Installation
Chapter 3: Installation
This chapter describes how to install the ST60 Multi instrument, and when
supplied, the Auxiliary Alarm.
For advice, or further information regarding the installation of this equipment,
please contact the Raymarine Product Support Department or your own National
Distributor.
3.1 Planning your installation
Before starting the installation, spend some time considering the best position for
the equipment, such that the
guidelines
Site requirements
With standard
With low
profile bezel
ST60 instrument dimensions
(below) are satisfied.
bezel
4.33 in (110 mm)
4.85 in (123 mm)
Site Requirements
0.95 in
(24 mm)
0.25 in
(6.2 mm)
EMC installation
and the
0.6 in
(15 mm)
1.4 in
(35 mm)
D5785-4
15