PERFORMANCE VERIFICATION

Verify probe accuracy with the test setups shown in Figure 4.
Required test equipment is defined in Table 1. Toriod coil
construction is illustrated in Figure 5. First setup Connection A,
and makes the checks called for in Table 2. (Connect the output
of the probe directly to the signal-in on the phase meter for the
phase check.)
Then disconnect A at the 5100B, and set up Connection B. Make
the first four checks called for in Table 3. (Connect the probe
directly to the phase meter for the phase check.)
Remove the shunt before making the last check at
500A. Otherwise, the maximum current rating of the
shunt will be exceeded.
REQUIRED
AC Calibrator
Transconductance Amplifier
Digital Multimeter (DMM)
Phase Meter
0.05Ω, 2A, non-inductive shunt
Small insulated screwdriver
Banana-to-BNC Adapter
50-Turn Toriod Coil
A
5100B DIRECT
0.05 Ω
0.25W
1%
SHUNT
Figure 4. Performance Test and Calibration Setup
CAUTION
Table 1. Required Test Equipment
PHASE METER
0 – 360
REMOTE
ON
+/– 100
POWER
LOCAL
OFFSET
RANGE
8050A
RECOMMENDED MODEL
Fluke Model 5100B
Fluke Model 5220A
Fluke Model 8050A
Clarke-Hess Model 6000
Empro Model HA-2-100
Spectral
Fluke Model PM9053
(See Figure 5.)
MODEL 6000 PHASE METER
OVERRANGE
DEGREES
UNDERRANGE
REFERENCE IN
10mV – 300mV
5100B
5220A
B
5100B/5220A
50-TURN TOROID COIL
OVERRANGE
UNDERRANGE
REFERENCE IN
10mV – 300mV