Start-Up & Performance Check List
2
1
2
INTAKE / EXHAUST PIPE
2
All Joints Primed and Glued
Terminations Installed Properly
Horizontal Pipes Sloped (if applicable)
Condensate Trap Primed / Line Sloped
Pipes Supported
Heat Cable Installed and Operable (if applicable)
UNIT SET UP
Furnace:
Model Number_______________
Serial Number_________________
GAS SUPPLY
LP Propane Gas
Natural Gas
Piping Connections Tight
Leak Tested
Supply Line Pressure "W.C.________
1
Gas Supply Pressure
1
SUPPLY
Line Voltage
4
3
4
Page 49
AIR
3
Flter
RETURN AIR
DUCT SYSTEM
SUPPLY AIR DUCT
Sealed
Insulated (if necessary)
RETURN DUCT
Sealed
Filter Installed and Clean
Grilles Unobstructed
VOLTAGE CHECK
Supply Voltage _____
Electrical Connections Tight