Initial Operation Of The Et 200; Initial Operation Of The Et 200 (With Im 308-C); Initial Operation Of The Et 200 (With S5-95U) - Siemens SIMATIC S5 Manual

Distributed i/o system
Hide thumbs Also See for SIMATIC S5:
Table of Contents

Advertisement

2.6

Initial operation of the ET 200

ET 200 with
The procedure for initial operation of the ET 200 distributed I/O system is as
IM 308-C: initial
follows:
operation
Table 2-9 Initial operation of the ET 200 (with IM 308-C)
ET 200 with
The procedure for initial operation of the ET 200 distributed I/O system is as
S5-95U as DP
follows:
master: initial
operation
Table 2-10
ET 200 Distributed I/O System
EWA 4NEB 780 6000-02a
Procedure – from planning to initial operation
Step
Objective
1
Using either the FB IM308C or the ET 200 handheld,
assign a valid station number to each DP slave which
requires software-driven assignment of a station
number.
2
Test the individual DP slaves with the ET 200
handheld, for example.
3
Connect the individual stations to the bus, following
the correct sequence.
4
Via the AS 511 interface of the programmable
controller, power up the ET 200 distributed I/O
system.

Initial operation of the ET 200 (with S5-95U)

Step
Objective
1
Using the ET 200 handheld, assign a valid station
number to each DP slave which requires software-
driven assignment of a station number.
2
Test the individual DP slaves with the ET 200 hand-
held, for example.
3
Connect the individual stations to the bus, following
the correct sequence.
4
Via the AS 511 interface of the programmable control-
ler, power up the ET 200 distributed I/O system.
Additional
information
See Section 9.6
Manual ET 200
Handheld
See Section 11.1
Manuals on the
programmable
controller
Additional in-
formation
Manual
ET 200-Handheld
See Section 12.1
Manuals on the
programmable con-
troller
2-9
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Et 200

Table of Contents