Step 8: Install The Rps And Apply Rps Dc Power - NETGEAR ProSAFE S3300 Hardware Installation Manual

Hide thumbs Also See for ProSAFE S3300:
Table of Contents

Advertisement

To apply AC power:
1.
Connect the end of the power cord to the power receptacle on the back of the smart
switch.
2.
Plug the AC power cord into a power source such as a wall socket or power strip.
When you apply power, the Power LED on the smart switch's front panel lights.
If the Power LED does not light, check that the power cord is plugged in correctly and that the
power source is good. If the problem remains, see

Step 8: Install the RPS and Apply RPS DC Power

This step is optional for models S3300-52X-PoE+ and S3300-28X-PoE+ only. These models
support an optional external redundant power supply (RPS).
To install the RPS and apply RPS DC power:
1.
Loosen the screws of the RPS cover plate and remove the cover plate.
The RPS receptacle is exposed.
2.
Plug in the RPS connector.
3.
Plug the AC power cord of the RPS into a power source such as a wall socket or power
strip.
Step 9: Manage the Switch Through a Web Browser or
the Smart Control Center Utility
The smart switch contains software for viewing, changing, and monitoring the way it works.
This management software is not required for the smart switch to work. You can use the
ports without using the management software. However, the management software enables
the setup of VLAN and trunking features and also improves the efficiency of the smart switch,
which results in the improvement of its overall performance as well as the performance of the
network.
After you power up the smart switch for the first time, you can configure the smart switch
using a web browser or a program called Smart Control Center. For more information about
managing the smart switch, see the S3300 Smart Switch Software Administration Manual.
The resource CD includes a link to this document.
Note:
The smart switch is configured with a default IP address of
192.168.0.239 and a subnet mask of 255.255.255.0.
S3300 Smart Switch
Appendix A,
Installation
30
Troubleshooting.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents