Operation Checks And Main Component Replacement Procedures; Checking Procedure For Each Major P.c.b - Technics SA-DA10 Service Manual

Av control stereo receiver
Table of Contents

Advertisement

file:///C|/Documents%20and%20Settings/Administrateur/Mes%20documents/service/SA-DA10/p10.htm
6 Operation Checks and Main
Component Replacement Procedures
TOP PREVIOUS NEXT
"ATTENTION SERVICER"
Some chassis components maybe have sharp edges. Be careful when diassembling and servicing.
1. This section describes procedures for checking the operation of the major printed circuit boards
and replacing the main components.
2. For reassembly after operation checks or replacement, reverse the respective procedures./Special
reassembly procedures are described only when required.
3. Select items from the following index when checks or replacement are required.
Content

Checking Procedure for each major P.C.B.

................................................................................................................. P.g. 8~12
Main Component Replacement Procedures
1. Replacement of the Power IC and Regulator
Transistor........................................................................................ P.g. 13~14
2. Installation of the bottom cover after
replacement....................................................................................................... P.g. 15
6.1 Checking Procedure for each major P.C.B.
6.2 Main Component Replacement Procedures
6.2.1 Replacement of the Power IC and Regulator Transistor
6.2.2 Installation of the bottom cover after replacement
file:///C|/Documents%20and%20Settings/Administrateur/Mes%20documents/service/SA-DA10/p10.htm (1 of 2) [21/01/2007 13:47:07]

Advertisement

Table of Contents
loading

Table of Contents