Check List - Oce ProCut 1600 M Manual

1600 series, 2500 series, 3200 series
Table of Contents

Advertisement

Océ ProCut

Check list

In order to avoid complications and misunderstandings, please use this list for your preparation
activities:
The delivery truck can reach the unloading location without obstruction.
A suitable forklift is available for installation.
Additional labor is available (if necessary) to get the machine to the installation location.
All the measures necessary to get the machine to the installation location are in place.
There are no obstructions on the route, e.g. steps, stairs.
A hand operated pallet jack or similar is available.
If the machine has to be stored temporarily, then a suitable place is available.
The size and weight of the machine have been taken into account and the floor is suitable
for the cutter.
The power main connection is ready.
The power main supply voltage is stable; the maximum fluctuation is within the tolerance
range (+/- 5%)
Compressed air system and connection is ready
If the Router Option was purchased the router vacuum cleaner will be available at
installation time.
The room complies with the requirements given in the "installation site and "Space
requirements" sections
An installation assistant has been arranged
The required PC's are pre-installed and ready for installation/configuration of the ProCut
Software
The future operator is available during installation and training
Océ ProCut Site Preparation Guide - Revision: E
Site Prep
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents