3
Installation
3-1. Operation of the Remote Controller
3-2. Control of the Remote Controller
3-3. Centralized Controller
3-4. Drain Hose Installation
3-5. Air-Purge Procedure
3-6. Refrigerant Refill Procedure
3-7. "Pump down" procedure
3-8. Performing Leak Tests
3-9. Installation the Front Panel
3-10. Setting Up Option Switches
3-11. Controlling a Group