Install Hydrogen Sensor Calibration Gas - Agilent Technologies 7890B Installation And Startup

Gas chromatograph
Hide thumbs Also See for 7890B:
Table of Contents

Advertisement

Install hydrogen sensor calibration gas

Pressure regulator
Calibration gas
cylinder
Gas cylinder
stand
Agilent 7890B Installation
If available, install the hydrogen sensor calibration gas. The
hydrogen sensor ship kit includes a pressure regulator that
installs directly onto the calibration gas cylinder. Agilent also
provides sufficient copper tubing and hardware to connect the
pressure regulator to the hydrogen sensor assembly calibration
gas input fitting.
1
Set the gas cylinder stand upright on the lab bench near the
GC. (Do not place it behind the oven exhaust vent!)
2
Turn the pressure regulator completely off and set the
output pressure as low as possible (full CCW).
Pressure adjustment
Tank pressure gage
1
Installing the GC
1/8-inch Swagelok nut
and ferrule
To hydrogen sensor
1/8-inch copper tubing,
cut to length needed
On/Off
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents