Schedules - Trane Tracer SC Operation Manual

System controller
Hide thumbs Also See for Tracer SC:
Table of Contents

Advertisement

Schedules

Scheduling forTracer SC is based on the BACnet schedule object implementation. For details, see
BACnet standard 135-2008. Scheduling facilitates the following tasks:
The Schedules page, shown in figure 1, contains four tabs: Active Schedules, All Schedules, All
Exceptions, and All Calendars.
Figure 1.
All Schedules (Active Schedules tab shown)
Optimal Start/Stop
Optimal start and stop times can be defined for HVAC schedules. HVAC refers to both Area and
equipment.
The schedule coordinates with the Area application or equipment to calculate when the optimal
start and stop occurs. Optimal start/stop times are based on outside air conditions, space
temperature, and occupied setpoints.
BAS-SVU025A-EN
Creating, editing, and deleting schedules
Creating, editing, and deleting calendars and exception schedules
Viewing all effective schedules in a facility
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bmsc000aaa011000Bmsc000aaa011100Bmsc000aaa011200

Table of Contents