Rheem 97MDV060 Series Installation Instructions Manual page 18

(-)97v series upflow condensing modulating, communicating gas furnaces w/ecm blower (-)97v series
Table of Contents

Advertisement

5A
5a - LEFT SIDE DRAIN OPTION
ATTACH HOSE A (PRE-INSTALLED) TO BULKHEAD COUPLING.
INSTALL HOSE CLAMP ON HOSE OVER BULK HEAD COUPLING.
Checklist:
__
VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__
CONFIRM THAT ALL HOSES ARE FREE OF KINKS.
__
CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW
__
BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE IDB COUPLING
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION.
__
ALL CLAMPS AND COUPLINGS ARE TIGHTENED
__
ALL DRAIN PORTS ARE PLUGGED
__
UNIT HAS FORWARD PITCH
__
HEAT TAPE INSTALLED (IF REQUIRED)
Notes:
18
5B
5b
- RIGHT SIDE DRAIN OPTION
5b1 - CUT TUBE "C" TO FIT CORRESPONDING CABINET WIDTH.
5b2 - INSERT TUBE "C" INTO END "2" OF HOSE- DOUBLE ELBOW
HOSE A
5b3 - SLIDE TWO WIRE CLAMPS OVER TUBE "C", SLIDE ONE WIRE CLAMP OVER
5b4 - INSTALL TUBE "C" WITH HOSE CLAMP AS SHOWN TO HOSE "A" "PRE ASSEMBLED".
5b5 - ATTACH HOSE - DOUBLE ELBOW TO BULKHEAD COUPLING POSITION WIRE HOSE
NOTE: PLIERS NECCESSARY TO ADD OR REMOVE CLAMPS
TUBE C
CUT TO FIT
CABINET WIDTH
HOSE A
END "1" OF HOSE - DOUBLE ELBOW.
CLAMP.
HOSE-DOBLE
ELBOW
(X2)
TUBE C
ST-A1194-69-00

Advertisement

Table of Contents
loading

Table of Contents