Rheem 97MDV060 Series Installation Instructions Manual page 17

(-)97v series upflow condensing modulating, communicating gas furnaces w/ecm blower (-)97v series
Table of Contents

Advertisement

UPFLOW LEFT VENT
FROM PARTS BAG (PROVIDED W/UNIT)
BULKHEAD
INTAKE
#8 X 1/2"
COUPLING
COUPLING
SCREW
W/ NUT
TUBE C
TOOLS/MATERIALS NEEDED:
DRILL
PLIERS
1/8" DRILL BIT
FLAT HEAD SCREWDRIVER
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
1
1c
1a
1b
DISCARD
1a - REMOVE FLUE TRANSITION, TRANSITION COUPLING, AND ELBOW.
(NOTE: REMOVE INDUCER COUPLING W/ELBOW FOR EASIER REMOVAL).
1b - REMOVE 3-3/8" FLUSH MOUNT PLUG FROM JACKET - DISCARD.
1c - RELOCATE 2-3/8" FLUSH MOUNT PLUG FROM JACKET TO TOP PLATE.
3
DRILL 1/8"
DISCARD
DETERMINE RIGHT OR LEFT DRAIN OPTION.
LOCATE 7/8" HOLE IN JACKET SIDE.
REMOVE PLUG - DISCARD
DRILL (2) Ø 1/8" HOLES FOR THE BULKHEAD COUPLING.
PARTS NEEDED:
(X2)
(X3)
HOSE
CLAMP
HOSE -
DOUBLE
ELBOW
5/16 HEX HEAD DRIVER
1/4" HEX HEAD DRIVER
FLUE TRANSITION
(DISCARD)
TRANSITION
COUPLING
(DISCARD)
ELBOW
(DISCARD)
IDB COUPLING
(RETAIN)
SEE CRITICAL HOSE CLAMP LOCATION NOTE
IN THE GENERAL CONVERSION INSTRUCTIONS.
FROM CONVERSION KIT RXGY-CK
2-5/8" FLUSH
2-3/8" PIPE
MOUNT PLUG
GROMMET
TUBING CUTTER
2
2-5/8"
2a
2b
2c
2a - INSTALL 2-5/8" FLUSH MOUNT PLUG IN TOP PLATE.
2b - INSTALL 2" PIPE GROMMET AS SHOWN.
2c - INSTALL INTAKE COUPLING AS SHOWN.
4
DISCARD
INSTALL BULKHEAD COUPLING USING (2) SCREWS.
DRILL 1/8"
INSTALL IN JACKET WITH THE BARBED FITTING
POINTED INTO THE VESTIBULE.
!
PARTS NEEDED FOR THIS
CONVERSION REQUIRE THE
OUTLINED ITEMS FROM THE PARTS BAG
AND CONVERSION KIT RXGY-CK. YOU
MUST HAVE THESE PARTS BEFORE
PROCEEDING.
NOTE:
IF THE IDB
COUPLING IS
REMOVED, IT
MUST BE
REPLACED IN
THE PROPER
ORIENTATION.
AN ARROW IS
PRESENT ON
THE COUPLING
TO INDICATE
THE DIRECTION
OF EXHAUST
FLOW. MAKE
SURE THE
ARROW POINTS
IN THE
CORRECT
DIRECTION.
INSTALL
ST-A1194-69-00
17

Advertisement

Table of Contents
loading

Table of Contents