Electrical Schedule - Invacare Rea Dahlia 30 Service Manual

Wheelchair passive
Hide thumbs Also See for Rea Dahlia 30:
Table of Contents

Advertisement

Rea® Dahlia® 30 / 45

2.22.5 Electrical schedule

A
Hand control
A
Battery
B
Seat tilt actuator
C
Backrest recline actuator
D
Mains cable
E
Control box
F
Cable lock actuators
G
Cable lock battery cable
H
CAUTION!
Risk of malfunction
The system may not work properly
– Connect all functions before connecting the mains cable.
– Connect the hand control first. The connection at the control box is marked with "HB".
– Connect the different actuators according to the schedule above.
– Check that all plugs are well connected and firmly pushed into the connection plug.
– Check that the cable locks are engaged in order for the cables to be secured in the control box.
– Connect the battery.
– Connect the mains cable and turn on the power.
– Control boxes must only be connected to the mains voltage specified on the label. See chapter "Electrical
system" for more information.
– Make sure that the cables are not trapped, tensed or exposed to sharp objects when using the system.
20
B
F
H
C
G
E
D
1572308-G

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rea dahlia 45

Table of Contents