Planning Before Installation - Eaton Powerware 9155 UPS20-30kVA User Manual

230v 50/60 hz output (3-phase input/1-phase output)
Table of Contents

Advertisement

4. Planning before installation
The equipment must be installed in upright position. The equipment requires space to front and
back to enable cooling airflow. Service and maintenance require 00 mm clearance on right
hand side. All cooling air enters at front and exits at unit rear. The required min. clearance from
unit rear to an obstruction is 20 mm. Because the service and user access is in the front there
should be reserved enough space (min 600 mm).
It is required to arrange ventilation of the UPS room. Sufficient amount of air cooling is needed
to keep the max. room temperature rise at desired level:
Temperature rise of max. +°C requires the airflow of 600 m
Temperature rise of max. +10°C requires the airflow of 300 m
An ambient temperature of 1 to 2 Celsius degrees is recommended to achieve a long life of
the UPS and batteries. The cooling air entering the UPS must not exceed +40 °C. Avoid high
ambient temperature, moisture and humidity.
The floor material should be non-flammable and strong enough to support the heavy load. The
UPS has (4) leveling feet that should be used when finalising the installation. The diameter of a
single leveling foot is 29 mm.
Equipment
Weight
20-30 kVA
UPS w/o BAT
200 kg
UPS+1 BAT
300 kg
UPS+2 BAT
400 kg
UPS+3 BAT
500 kg
UPS+4 BAT
600 kg
EXT BAT 0
150 kg
EXT BAT 1
510 kg
EXT BAT 2
870 kg
Table 1 The floor surface must tolerate loading.
12
Point
20-30 kVA
7.57 kg/cm
2
11.35 kg/cm
2
15.14 kg/m
2
18.92 kg/cm
2
22.71 kg/cm
2
5.67 kg/cm
2
19.29 kg/cm
2
32.90 kg/cm
2
UPS 20-30 kVA, 230 V 0/60 Hz output
User's Guide
per 1 kW of losses.
3
per 1 kW of losses.
3
Distributed
Note
20-30 kVA
531 kg/m
No Batteries installed
2
797 kg/m
1 Battery string installed
2
1063 kg/m
2 Battery strings installed
2
1328 kg/m
3 Battery strings installed
2
1594 kg/m
4 Battery strings installed
2
401 kg/m
No Batteries installed
2
1362 kg/m
1 Battery string installed
2
2323 kg/m
2 Battery strings installed
2
1026743
Revision B