Huawei AP7050DE Hardware Installation And Maintenance Manual page 41

Hide thumbs Also See for AP7050DE:
Table of Contents

Advertisement

AP7050DE
Hardware Installation and Maintenance Guide
Table 5-3 Mapping between the cross-sectional area of the conductor and the value of L1
Cross-
Sectional
Area of
Conductor
(mm
1 (0.002)
1.5 (0.002)
2.5 (0.004)
4 (0.006)
6 (0.009)
Step 2 Put the cord end terminal onto the conductor, and ensure that the conductor is aligned with the
edge of the cord end terminal, as shown in
After the conductor is fed into the cord end terminal, the protruding part of the conductor
must not be longer than 1 mm (0.04 in.).
Figure 5-13 Putting the cord end terminal onto the conductor
Step 3 Crimp the joint parts of the cord end terminal and the conductor, as shown in
Issue 01 (2016-04-15)
Value of L1
(mm(in.))
2
2
(in.
))
8 (0.31)
10 (0.39)
10 (0.39)
12 (0.47)
14 (0.55)
NOTICE
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Cross-Sectional
Area of Conductor
2
2
(mm
(in.
))
10 (0.015)
16 (0.025)
25 (0.039)
35 (0.054)
50 (0.077)
Figure
5-13.
5 Appendix
Value of L1
(mm(in.))
15 (0.59)
15 (0.59)
18 (0.71)
19 (0.75)
26 (1.02)
Figure
5-14.
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents