Start-Up Checklist - Carrier 50HS018 Installation, Start-Up And Service Instructions Manual

Single-package heat pump units
Table of Contents

Advertisement

I. PRELIMINARY INFORMATION
MODEL NO.:
DATE:
II. PRE-START-UP (insert checkmark in box as each item is completed)
VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
CHECK THAT INDOOR-AIR FILTER IS CLEAN AND IN PLACE
VERIFY THAT UNIT INSTALLATION IS LEVEL
CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW
TIGHTNESS
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS
INDOOR-FAN AMPS
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
RETURN-AIR TEMPERATURE
COOLING SUPPLY AIR
ELECTRIC HEATER SUPPLY AIR
PRESSURES (COOLING)
REFRIGERANT SUCTION
REFRIGERANT DISCHARGE
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS ON PAGES 19-21.
VERIFY 3-PHASE SCROLL COMPRESSOR (048,060 ONLY) IS ROTATING IN CORRECT DIRECTION.
Copyright 1997 Carrier Corporation
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
PC 111
Catalog No. 565-041
Tab
5a 5a

START-UP CHECKLIST

(Remove and Store in Job File)
L1-L2
L2,L3
L1
PSIG
PSIG
Printed in U.S.A.
SERIAL NO.:
TECHNICIAN:
L3-L1
L2
L3
DB (DRY BULB)
DB
WB (WET BULB)
Form 50HS-9SI
CL-1
2-97
Replaces: 50HS-8SI

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

50hs02450hs03650hs04250hs04850hs03050hs060

Table of Contents