Roland G-70 Service Notes page 40

Hide thumbs Also See for G-70:
Table of Contents

Advertisement

HOW TO ENTER IN BENDER CALIBRATION UPON SWITCH ON.
Switch on the instrument keeping the "ASSIGN SW 1 " button pressed.
After a few seconds the display will show:
Place the Bender lever at the center and press the ASSIGN SW 1 button, the display will
show:
Move the Bender lever completely to the left and press the ASSIGN SW 1 button, the
display will show:
Move the Bender lever completely to the right and press the ASSIGN SW 1 button, the
display will show:
Release the Bender lever at the center and press the ASSIGN SW 1 button, the display
will show:
Push the Bender lever completely to the center and press the ASSIGN SW 1 button. To
confirm the calibration, the instrument exits the test, resets itself and reverts to the video of
the main menu.
** BENDER CALIBRATION **
Calibrating the CENTER POSITION :
Release The Pitch Bend lever, press ASSIGN SW 1
** BENDER CALIBRATION **
Calibrating the HARD LEFT POSITION :
Move Pitch Bend lever, to the Left and press ASSIGN SW 1
** BENDER CALIBRATION **
Calibrating the HARD RHIGT POSITION :
Move Pitch Bend lever, to the Right and press ASSIGN SW 1
** MODUL CALIBRATION **
Release the Modulation Lever :
Press the ASSIGN SW 1
** MODUL CALIBRATION **
Press the Modulation Lever To the back of the G-70
and press ASSIGN SW 1
G-70
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents