Brewer Setup - Fetco CBS-1131-XV+ User's Manual & Operating Manual

Cbs-1130 extractor v+
Table of Contents

Advertisement

NOTE-Assemble legs after unpacking the brewer and before connection to utilities
1) attach legs for 1 Gallon / 3 Liter dispensing
STANDARD WITH UNIT
2-1/2" legs -
Attach this length for
1 Gallon dispenser or 3 liter airpot.
Legs are sent from factory inside brew basket. Attach legs before installing
2) Adjust dispenser locator for either 3 Liter / 1 Gallon dispensing
Brew basket
Touch-screen for brewer
Hot Water Faucet
Air pot or Dispenser Locator
(Two for twin side)
Layout of the brewer
Operation and service
Go to fetco.com for the latest versions of all information
Set Dispenser Locator
 Shown with 1 gallon
dispenser locator
-(Factory installed)
Shown with 3 liter air pot
-(User option)
LAYOUT OF THE BREWER
Operation and service
operation
SELECT brewer model
From PROGRAMMING (Page 4) go to position E2
Select model and SAVE (Page 9)
Be certain to SAVE new settings

Brewer Setup

1" legs -
Attach this length for 3 Liter air pot configuration
(Purchase separately as optional kit).
Locator 
User Guide & Operator instructions
Page 12
For installing brewer
Power
Switch
Electrical
Connection
USB
Connection
P166
Re0
NOVEMBER 2017
Water
Supply
Connection

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbs-1132-xv+Extractor cbs-1130 v+ seriesExtractor cbs-1131-xv+Extractor cbs-1132-xv+

Table of Contents