Fetco CBS-2152XTS User Manual

Fetco CBS-2152XTS User Manual

Hot beverage brewers
Hide thumbs Also See for CBS-2152XTS:

Advertisement

®
FETCO Models:
CBS-2151
Commercial Hot Beverage Equipment
Contact Information........................................................ 2
Description & Features .................................................. 2
Factory settings.............................................................. 2
Layout of the brewer ...................................................... 3
Operating Instructions.................................................... 4
Menu Features: Batch Parameters................................ 7
© 2014 Food Equipment Technologies Company
User's Guide, Operator Instructions and Access
CBS-2152
XTS
6-liter/1 ½ -gallon
hot beverage brewers

Table of Contents

NOTICE TO INSTALLER: Please leave this book with the machine.
CBS-2152-2
XTS
7.3-liter-2gallon
How to calibrate the flow rate .......................................10
Operator Training .........................................................12
Safety Notes .................................................................13
Error Codes ..................................................................13
Installation Directions ...................................................15
Final Setup for Startup..................................................21
Parts and Wiring Diagrams ..........................................22
.
XTS
OCTOBER 2014
P129 rev 001

Advertisement

Table of Contents
loading

Summary of Contents for Fetco CBS-2152XTS

  • Page 1: Table Of Contents

    User’s Guide, Operator Instructions and Access ® FETCO Models: CBS-2151 CBS-2152 CBS-2152-2 6-liter/1 ½ -gallon 7.3-liter-2gallon hot beverage brewers Commercial Hot Beverage Equipment Table of Contents Contact Information............2 How to calibrate the flow rate ........10 Description & Features ..........2 Operator Training ............12...
  • Page 2: Contact Information

    Sales (North Americas): sales@fetco.com Phone: (847) 719-3000 Sales (International): international@fetco.com Toll Free: (800)FETCO.99 or (800) 338-2699 Internet: www.fetco.com Description & Features CBS-2150XTS Series coffee brewers feature universal spray over technology from the Cascading Spray Dome™. The following variables are programmed for each batch size:...
  • Page 3: Accessing Equipment And Control Screens

    Accessing equipment and control screens Layout of the brewer Touch-screen for brewer operation Brew basket sensor (internal) SD card interface port (Load & Save) Hot Water Faucet Airpot or Dispenser Locator (Two for dual side) Main power switch Slide out back panel for service access Accessing batch and programming menu screens Regular 1.50...
  • Page 4: Operating Instructions

    1.50 1.50 05:30 05:30 Heating screen Touch batch pennant Regular Regular 1.50 to access menu 1.50 Filling unlock™ 05:30 05:30 CBS-2152XTS EXTRACTOR Decaf Decaf 1.50 1.50 Example shown is CBS-2152 XTS Dual 05:30 05:30 Decaf Decaf 1.50 1.50 05:30 05:30...
  • Page 5 05:30 1.50 enabled:brew start will be EXTRACTOR per side. 05:30 Decaf 1 TOUCHSCREEN 1:50 Decaf 1 CBS-2152XTS has right and left enabled when tank temperature CBS_2132 3L 05:30 1.50 Ready Tank Temp °F Decaf 2 05:30 CBS-2151XTS single side reaches the temperature set...
  • Page 6: Programming- Operator Access Programming

    Programming- operator access programming -The FETCO CBS-2150XTS brewers have four brew batch menus per side. Menus are preprogrammed by the factory with basic settings that will operate the equipment as purchased. There are two batches each marked “Regular” and two marked “Decaf”...
  • Page 7: Menu Features: Batch Parameters

    Models CBS-2130, Screen will display in • Batch Volume |_________ ________| CBS-2140, CBS-2150- [ 0.50-2.00] range and units selected 0.50 2.00 2.5 gal CBS-2152XTS 2.00 gal For CBS-2152-2 Gallon • Batch Volume |_____________ ____| 2 Gallon [ 0.50-2.25] equipment 0.50 2.25...
  • Page 8 Programming Factory set Programming Range GENERAL Notes Items Default (display) 200 °F Correction for high Tank Temp. 200°F |______________[]___| altitude below “OFF” allows Brew at Temp. “ON” SEE NOTE BELOW! brewing at any |________[]_______| ON AUTO temperature. °F • Temperature Units of Meas.
  • Page 9 Programming Factory set Programming Range OUTPUTS Notes Items Default (display) 3400 Left Brew FR 2400 Left Bypass FR 3400 Right Brew FR • 2400 FR=Flow Rate ml/min Show Summary Right Bypass FR Output Summary Screen Contrast Screen Brightness Touch To Return TEST Runs valve to verify Left Valve...
  • Page 10: How To Calibrate The Flow Rate

    For factory or qualified service professional use only How to calibrate the flow rate Set the flow rates of components to adjust for taste profile and for over or under potting. Built-in algorithms in Brewer controller software corrects brew parameter to customer preferences or to trim variations in flow control components NOTICE: This operation requires operator hold finger on keypad position for one minute—without lifting it.
  • Page 11: Error Codes

    Programming Factory set Programming Range OTHER Notes Items Default (display) See Error Code Chart Error Codes • Display Errors (Codes) for references Reset !!Errors must be • Reset Errors (Reset) |_______________[]____| corrected and cleared!! Setup upload Brewer --------------------------------------------------------------------------- Copy Program •...
  • Page 12: Operator Training

    Operator Training Review the operating procedures with whoever will be using the brewer. Pay particular attention to the following areas: 1. Always pre-heat the dispensers before the first use of each day by filling them half way with hot water, and letting them stand for at least 5 minutes.
  • Page 13: Safety Notes

    5. Do not attempt to move hot beverage equipment once it is filled. Drain equipment before moving. 6. FETCO commercial coffee brewers prepare large amounts of coffee or tea in a single batch using very hot water 7. Commercial coffee brewers provides very hot water from the sprayhead, brewbasket and faucet when it is pulled.
  • Page 14: Service Guide To A Successful Installation

    3. Verify voltages, polarity, circuits, and circuit breaker access before attaching equipment. 4. The electrical diagram is located in the Users Guide and online at www.fetco.com. 5. Make sure of the tight grounding of the equipment and use the external ground bolt.
  • Page 15: Installation Directions

    General: Utilize only qualified beverage equipment service technicians for installation. A Service Company Directory may be found on our web site, http://www.fetco.com. Water Connection 1. This equipment is to be installed to comply with the applicable federal, state, or local plumbing codes.
  • Page 16: Electrical Connection

    Electrical-General 1. All FETCO brewers require Ground. Installation without ground may cause a hazard. 2. The electrical diagram with universal wiring instructions is located on the inside of the lower cover. 3. The installation must comply with applicable federal, state, and local codes having jurisdiction at your location.
  • Page 17: Cbs-2150Xts Dimensions & Utility Connections

    81.6kg 106.3kg 43.7 l 43.5kg 559x686x940mm Rough-in CBS-2151XTS —Single station version Rough-in CBS-2152XTS —Dual station version CBS-2150XTS Utility Requirements Water Requirements: Inlet Water Temperature: Cold supply 20-75 psig (138-517kPa) 1½gpm/(5.7lpm) Coffee Filter Size: CBS-2150XTS: 15” X 5 ½ ” Water inlet fitting is a 3/8 inch male flare.
  • Page 18 CBS_2151XTS—Single 1½ gallon version Electrical Configurations CBS_2151XTS—Single 1½ gallon version Electrical Configurations USA and Canada Configuration Code Heater Electrical Gallon/Hour Voltage Phase Wires Amp Draw Plastic Stainless Steel Configuration Connection (1½ gallon per batch Brewbasket Brewbasket E215151 E215151M 2 X 3.0 kW 208-240 Hardwired 4.6-6.1...
  • Page 19 CBS_2152XTS—Twin 1½ gallon version Electrical Configurations USA and Canada CBS_2152XTS—Twin 1½ gallon version Electrical Configurations Configuration Codes Heater Electrical Maximum Brew-Volume/Hour Voltage Phase Wires Plastic Stainless Steel Configuration Connection Amp Draw (1½ gallon per batch) Brewbasket Brewbasket E215251 E215251M 2 X 3.0 kW 208-240 Hardwired 4.6-6.1...
  • Page 20 Rough-in CBS-2152-2 gallon XTS —Dual station version NOTICE: This model uses 2 gallon dispensers CBS-2150XTS Utility Requirements Water Requirements: Inlet Water Temperature: Cold supply 20-75 psig (138-517kPa) 1½gpm/(5.7lpm) Coffee Filter Size: CBS-2150XTS: 15” X 5 ½ ” Water inlet fitting is a 3/8 inch male flare. Electrical: See electrical configuration chart.
  • Page 21: Final Setup For Startup

    EXTRACTOR SCREENS SHOWN TO THE RIGHT WILL APPEAR TOUCHSCREEN 4. The water tank will begin filling. FETCO Home Screen #1 will read “FILLING”. Ready Touch 5. When the water level rises and is sensed by the probe at the top of the tank the...
  • Page 22: Parts And Wiring Diagrams

    Parts and Wiring Diagrams CBS-2152,XTS Drawings 1109.00065, 64, 63, 62.00 SERVICE PARTS ITEM NO PART NO DESCRIPTION 1071.00010.00 FAUCET HPSC-BR-8 REGULAR HANDLE 1023.00147.00 PLUG, TANK SERVICE DRAIN FOR 18GA AND UP BODY 1057.00043.00 SOLENOID VALVE, SINGLE, 180 DEG, 24VDC 1073.00007.00 LEG, FLANGE FOOT, 4"...
  • Page 23 CBS-2152,XTS Drawings 1109.000[75-67-66].00 SERVICE PARTS, CBS-2152 XTS TANK ITEM NO PART NO DESCRIPTION 1024.00053.000 LEVEL AND TEMP PROBE GROMMET 1023.00166.00 FITTING, COLD WATER INLET, GROMMET DESIGN 1102.00161.00 PROBE ASSEMBLY, TEMP. AND LLC, HWD-2100 1112.00019.00 PROBE WELDMENT, WATER LEVEL 2.600" LG 1024.00007.00 O-RING, DASH #344, TANK COVER 1102.00007.00...
  • Page 24 CBS-2151,XTS Drawings 1109.00061.00 SERVICE PARTS ITEM NO PART NO DESCRIPTION 1102.00223.00 SPRAY HOUSING, LARGE, COMPLETE ASSEMBLY, 24 VDC 1102.00220.00 ASSEMBLY, BYPASS VALVE, RIGHT 1102.00113.00 SWITCH, REED, ASSEMBLY 1102.00219.00 ASSEMBLY, BB LOCKER, 24VDC 1071.00010.00 FAUCET HPSC-BR-8 REGULAR HANDLE 1024.00040.00 CARD PLUG, HWD-2100 1023.00147.00 PLUG, TANK SERVICE DRAIN FOR 18GA AND UP BODY 1402.00045.00...
  • Page 25 CBS-2151,XTS Drawing 1109.00076.00 SERVICE PARTS, TANK ITEM NO PART NO DESCRIPTION 1023.00166.00 FITTING, COLD WATER INLET, GROMMET DESIGN 1024.00053.00 LEVEL AND TEMP PROBE GROMMET 1102.00161.00 PROBE ASSEMBLY, TEMP. AND LLC, HWD-2100 1112.00019.00 PROBE WELDMENT, WATER LEVEL 2.600" LG 1107.00005.00 HEATER ASSEMBLY, IMMERSION 3000W/240VAC 1024.00007.00 O-RING, DASH #344, TANK COVER 1102.00007.00...
  • Page 26 CBS-2152,XTS Drawing 1109.00091.00 SERVICE PARTS, BACK PANEL- ITEM NO PART NO DESCRIPTION 1086.00008.00 CONNECTOR, CABLE CLAMP, 3/4" 1058.00020.00 SWITCH, PWR ROCKER RED, ILLUM. 250VAC 1052.00001.00 POWER SUPPLY, 90-264VAC/24VDC, 1.8A 1029.00012.00 SPACER, .25" HEX X 1" LG, FEM #4-40 THREAD 1052.00004.00 TERMINAL BLOCK CBS-2152,XTS Drawing 1109.00046.00 SERVICE PARTS, BACK PANEL- ITEM NO...
  • Page 27 CBS-2151,XTS Drawing 1109.00092.00 SERVICE PARTS, BACK PANEL- ITEM NO PART NO DESCRIPTION 1052.00002.00 TERMINAL BLOCK, 3 POLE, W/ MARKING STRIP 1086.00008.00 CONNECTOR, CABLE CLAMP, 3/4" 1058.00020.00 SWITCH, PWR ROCKER RED, ILLUM. 250VAC 1052.00001.00 POWER SUPPLY, 90-264VAC/24VDC, 1.8A 1029.00012.00 SPACER, .25" HEX X 1" LG, FEM #4-40 THREAD CBS-2151,XTS Drawing 1109.00048.00 SERVICE PARTS, BACK PANEL- ITEM NO PART NO...

This manual is also suitable for:

Cbs-2152-2xtsCbs-2151xts

Table of Contents