Commissioning
5.4 Quick commissioning using the BOP-2 operator panel
During motor data identification, "MOT-ID" flashes on the BOP‑2.
The motor data identification can take up to 2 minutes depending on the rated motor power.
Depending on the setting, after motor data identification has been completed, the inverter
switches off the motor - or it accelerates it to the setpoint.
If required, switch off the motor.
Switch the inverter control from HAND to AUTO.
You have completed the motor data identification.
148
Converter with the CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2017, FW V4.7 SP6, A5E34259001B AD