Siemens SINAMICS G120 Operating Instructions Manual page 148

Low voltage converters chassis devices with cu240b-2 and cu240e-2
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Commissioning
5.4 Quick commissioning using the BOP-2 operator panel
During motor data identification, "MOT-ID" flashes on the BOP‑2.
The motor data identification can take up to 2 minutes depending on the rated motor power.
Depending on the setting, after motor data identification has been completed, the inverter
switches off the motor - or it accelerates it to the setpoint.
If required, switch off the motor.
Switch the inverter control from HAND to AUTO.
You have completed the motor data identification.
148
Converter with the CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2017, FW V4.7 SP6, A5E34259001B AD

Advertisement

Table of Contents
loading

Table of Contents