Safe Operation Checklist

Safe operation of the portable generator requires the completion of the following tasks:
Carbon Monoxide (CO) Alarm
Carbon monoxide (CO) alarm(s) in working order.
Smoke Alarm
Smoke alarm(s) in working order.
Generator Location
Generator placed in a Carbon Monoxide (CO) safe zone. See Generator Location to reduce the Risk of
Carbon Monoxide Poisoning.
Generator placed in a fire safe zone. See Generator Location to reduce the Risk of Fire.
Generator located on flat and level surface.
Oil and Fuel
Engine filled to proper oil level, See Verify Engine Oil Level.
Fuel tank filled at or below baffle. See Add Fuel.
Inspect fuel lines, tank, cap and fittings each time before using generator. DO NOT use if fuel leak or damage
is found.
Electrical
When connecting to a buildings electrical system install listed transfer equipment. See Connecting to a
Building's Electrical System.
Electrical cords are rated for intended loads. See Cord Sets and Receptacles.
Electrical cords do not run through doorways, windows, holes in ceilings, walls or floors.
Inspect electrical cords thoroughly before each use. DO NOT use if damaged.
All labeled electrical cord safeties are understood and being followed.
Operation
Start engine. See Starting the Engine.