Cisco Firepower 4100 Series Hardware Installation Manual page 51

Hide thumbs Also See for Firepower 4100 Series:
Table of Contents

Advertisement

Mount and Connect
Figure 34: Front Securing Mechanism Inside the Front End
1
3
Step 4
Install the slide rails into the rack:
a) Align one slide-rail assembly front end with the front rack-post holes that you want to use.
The slide rail front-end wraps around the outside of the rack post and the mounting pegs enter the rack-post holes
from the outside-front.
The rack post must be between the mounting pegs and the open securing
Note
plate.
b) Push the mounting pegs into the rack-post holes from the outside-front.
c) Press the securing plate release button marked 'PUSH.' The spring-loaded securing plate closes to lock the pegs in
place.
d) Adjust the slide-rail length, and then push the rear mounting pegs into the corresponding rear rack-post holes. The
slide rail must be level front-to-rear.
The rear mounting pegs enter the rear rack-post holes from the inside of the rack post.
e) Attach the second slide-rail assembly to the opposite side of the rack. Make sure that the two slide-rail assemblies
are at the same height with each other and are level front-to-back.
f) Pull the inner slide rails on each assembly out toward the rack front until they hit the internal stops and lock in place.
Step 5
Insert the chassis into the slide rails.
a) Align the rear of the inner rails that are attached to the chassis sides with the front ends of the empty slide rails on
the rack.
b) Push the inner rails into the slide rails on the rack until they stop at the internal stops.
Front mounting pegs
Works with square slots,
Note
7.1mm holes, and 10-32
threaded holes
Rack post
Securing plate shown pulled back to open
2
position
Cisco Firepower 4100 Series Hardware Installation Guide
Rack-Mount the Chassis
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents