Storage V7000 - Lenovo Storage V7000 Quick Installation Manual

Machine types: 6538
Hide thumbs Also See for Storage V7000:
Table of Contents

Advertisement

Table 4. Steps for different installation scenarios (continued)
New system (control enclosure only)
"Installing support rails for the Lenovo
Storage V7000 control enclosure" on page
11
"Installing the enclosures" on page 19
"Connecting Ethernet cables to node
canisters" on page 24
"Connecting Fibre Channel cables to
a 10 Gbps iSCSI-FCoE 4-port host
interface adapter" on page 25
"Powering on the system" on page 27
Chapter 3 "Configuring the system" on page
29
1
Complete these steps for each expansion enclosure that you add.
2
Complete these steps for each control enclosure and expansion enclosure that you add.
Be familiar with the following information
• See "Caution notices for the Lenovo Storage V series" on page vi and "Danger notices for Lenovo Storage
V7000" on page viii for a summary of the situations that can be potentially hazardous to you. Before
installing, read and understand the following caution and danger statements.
• Use safe practices when lifting. The fully populated enclosure weighs about 37 kg (82 lbs). At least three
people are required to lift and install the enclosure into the rack or to remove an enclosure from the rack.
CAUTION:
Use safe practices when lifting.
2
Lenovo Storage V7000 Quick Installation Guide
New system (control
enclosure and one
Adding expansion
or more expansion
enclosures to an
enclosures)
existing system
"Installing support
"Installing support
rails for the Lenovo
rails for Lenovo

Storage V7000

Storage V7000
control enclosure"
expansion
on page 11
enclosures" on page
15
"Installing support
rails for Lenovo
Storage V7000
expansion
enclosures" on
page 15
"Installing the
"Installing the
enclosures" on page
enclosures" on page
19
19
"Connecting SAS
"Connecting SAS
cables to expansion
cables to expansion
enclosures" on page
enclosures" on page
21
21
"Connecting Ethernet
"Powering on the
cables to node
system" on page 27
canisters" on page
24
"Connecting Ethernet
"Adding an expansion
cables to node
enclosure to an
existing system" on
canisters" on page
24
page 33
"Powering on the
system" on page 27
Chapter 3
"Configuring the
system" on page 29
Adding control
enclosures
and expansion
enclosures to an
existing system
"Installing support
rails for the Lenovo
Storage V7000
control enclosure"
on page 11
1
"Installing support
rails for Lenovo
Storage V7000
expansion
enclosures" on
page 15
"Installing the
enclosures" on page
1
2
19
"Connecting SAS
cables to expansion
enclosures" on page
1
1
21
"Connecting Ethernet
1
cables to node
canisters" on page
2
24
"Powering on the
system" on page 27
"Adding a control
enclosure to an
existing system "
on page 33
2

Advertisement

Table of Contents
loading

Table of Contents