Chapter 1
Install the Shelf and Common Control Cards

DLP-G30 Install the FlexLayer Shelf

Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
The FlexLayer shelf requires 1 RU in a standard 19-inch (482.6-mm) or 23-inch (584.2-mm) rack.
Step 1
Locate the RMU space specified in your site plan. Refer to
typical DWDM site layout plans.
A set of mounting brackets are included with the FlexLayer mounting kit, one set each for 19-inch
Step 2
(482.6-mm) or 23-inch (584.2-mm) racks. Verify that your chassis is equipped with the correct set of
brackets for your rack. Change the brackets as required.
Step 3
Align the chassis with the rack mounting screw holes; one at a time, insert and tighten the three screws.
Repeat this task as necessary for each FlexLayer shelf assembly you want to install.
Step 4
Return to your originating procedure (NTP).
Step 5

DLP-G31 Install the FlexLayer Modules

Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Determine the FlexLayer modules that you want to install in the FlexLayer shelf. The FlexLayer shelf
Step 1
can house up to four Add/Drop FlexLayer modules.
and part numbers. Refer to
FlexLayer modules.
September 2004
This task installs the FlexLayer shelf. Perform this task if you are
installing any FlexLayer modules or are protecting more than two channels
with Y-cable protection modules.
#2 Phillips screwdriver
FlexLayer shelf assembly (15216-FL-SA)
As needed
Onsite
None
This task installs the FlexLayer modules in the FlexLayer shelf assembly.
You can only install two-channel FlexLayer modules.
#2 Phillips screwdriver
FlexLayer modules
As needed
Onsite
None
Table 1-11
Chapter 13, "Shelf Hardware Reference"
Cisco ONS 15454 DWDM Installation and Operations Guide, R4.7
DLP- G30 Install the FlexLayer Shelf
Chapter 13, "Shelf Hardware Reference"
lists the two-channel FlexLayer modules
for more information about
for