3.- COMMISSIONING AND OPERATION

3.1.- PRELIMINARY CHECKS BEFORE FIRST INSTALLATION

- Check that the power supply is the same as stated on the Rating Plate which is in agreement with the electrical
diagram for the unit and that cable sizes are correct.
- Check that tightness of the electrical connections to their terminals and to ground.
- Check the control panel connections.
(If the connection is incorrect, the unit will not operate and the control panel display will not light).
- Check with your hand that the fans are turning freely.
Legislation does not allow refrigerant gas emissions to the atmosphere, so the refrigerants have to be recycled
to avoid being released to the atmosphere. Those recycled refrigerants shall be processed afterwards by an
authorized waste manager.
Those components derived from the recycling of the unit have to be managed by authorized waste manager or be
left in local waste facilities according the local normative in each country.