Toshiba MCY-MHP0404HS-E Service Manual page 52

Multi type
Table of Contents

Advertisement

Checklist 1
Using Checklist 1, check that there are no problems with the installation work.
Is the capacity of the circuit breaker
(Earth leakage breaker) appropriate?
Is the gauge of the
power cable correct?
s I
h t
e
c
o
t n
o r
c l
o
m
m
u
n
c i
t a
Is the power of indoor units supplied collectively?
Is it grounded to earth?
Is the insulation resistance sufficient? (10 M
s I
h t
e
m
a
n i
p
o
w
r e
v
l o
a t
g
e
Is the diameter of connecting pipe correct?
Is the branch kit correct?
Is the water drain of the indoor unit arranged so that it flows without accumulation?
Is the heat insulation of pipes sufficient? (connecting pipes, branch kit)
Is there no short circuit of discharge air in the indoor / outdoor units?
After an airtightness test of the pipes, are vacuuming and adding of refrigerant executed?
Are the valves of all the outdoor units fully opened?
AMP Air Conditioning
o i
n
n i l
e
c
r o
e r
c
? t
r o
h
g i
h
e
) r
s
f u
c i f
e i
n
? t
(
i w
h t
in 220 - 240 V ±10%)
Outdoor unit
A
Outdoor unit
mm
n I
d
o
r o
o -
u
d t
o
r o
c
o
n
n
e
Central control system connection terminals (U3, U4)
M
V
Outdoor unit
65
51
www.ampair.co.uk | sales@ampair.co.uk
Indoor unit
2
Indoor unit
t c
o i
n
t
r e
m
n i
a
s l
(
U
, 1
U
) 2
or higher
Gas side
Liquid side
A
2
mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents