Toshiba MCY-MHP0404HS-E Service Manual page 166

Multi type
Table of Contents

Advertisement

Step Component
14 PMV coil
1. Detachment
2. Attachment
AMP Air Conditioning
Procedure
1) Remove the front panels, and upper panel.
[Step.1]
2) Remove the connector connected between the
interface P.C. board and PMV coil.
CN300 ...PMV coil (6P: white)
3) Remove the lead wire from the lead wire clamp
(1 position) and the banding band (3 places).
(Fig 14-1)
4) Rotate the coil, and remove while pulling it up
after the fi ngernail is removed. (Fig. 14-2)
1) Match the positioning extrusion of the coil
surely to the concavity of PMV body to fi x it.
CAUTION
Using a banding band on the market, be sure
to fi x the lead wire.
PMV coil
PMV body
Attach the
PMV coil lead
wires so they
face the left
side of the set.
165
www.ampair.co.uk | sales@ampair.co.uk
Remarks
Lead wire clamp
(1 position)
Banding band
(4 positions)
(Fig. 14-1)
PMV coil
Rotate the coil, and
remove while pulling
it up after the
fingernail is removed.
PMV body
(Fig. 14-2)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents