Shifter Installation; Shift Linkage Adjustment - Linhai LH400CUV-2 Service Manual

Table of Contents

Advertisement

CHAPTER 6 TRANSMISSION
shifter on the CUV. Put a new sticker on the knob
in correct direction
NOTE: If moisture or corrosion is found in the shift
rod the boot should be replaced.
6.4 SHIFTER INSTALL ATION
1.
Place shift rod back into the mounting bracket
and replace five bolts.
2.
Reconnect linkage rods to shift rod slides.
Adjust as required. See linkage adjustment
procedures.
3.
Replace remaining parts.

6.5 SHIFT LINKAGE ADJUSTMENT

Linkage
rod
adjustment
symptoms include:
 Noise on deceleration
 Inability to engage a gear
 Excessive gear clash(noise)
 Shift selectors moving out of desired range
NOTE: When adjusting linkage, always adjust both
linkage rods. The adjustment of one rod can prevent
proper adjustment of the other rod. Remove
necessary components to gain access to shift
linkage rod ends.
1. Inspect shift linkage tie rod ends, and pivot
bushings and replace if worn or damaged.
Lubricate the tie rod ends with a light aerosol
lubricant or grease.
2. Loosen all rod end adjuster jam nuts.
3. Note orientation of tie rod end studs with stud up
or down. Remove both rod end studs from
transmission bell cranks.
4. Be sure idle speed is adjusted properly.
NOTE: It is important to disconnect both rod ends
from the transmission bell cranks. If one linkage rod
is incorrectly adjusted, it can affect the adjustment of
the other rod.
5. Place gear selector in neutral. Make sure the
transmission bell cranks are engaged in the
is
necessary
when
CUV SERVICE MANUAL 07.0
CHAPTER 6
TRANSMISSION
PAGE. 6-
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents