Final Check List - Scotsman C0322 Installation And User Manual

Modular cuber prodigy plus e series
Hide thumbs Also See for C0322:
Table of Contents

Advertisement

C0322 through C1030 E Series
Air and Water Cooled User Manual

Final Check List

After connections,
1. Wash out the bin. If desired, the interior of the bin
could be sanitized.
2. Locate the ice scoop (if supplied) and have it
available for use when needed.
Final Check List:
1. Is the unit located indoors in a controlled
environment?
2. Is the unit located where it can receive adequate
cooling air?
3. Has the correct electrical power been supplied to
the machine?
4. Have all the water supply connections been
made?
5. Have all the drain connections been made?
6. Has the unit been leveled?
7. Have all unpacking materials and tape been
removed??
8. Is the water pressure adequate?
9. Have the drain connections been checked for
leaks?
10. Has the bin interior been wiped clean or sanitized?
11. Have any water filter cartridges been replaced?
12. Have all required kits and adapters been properly
installed?
Open door to access On
and Off switch buttons.
Lower Light and Switch Panel
This user accessible panel provides important
operational information and duplicates the lights and
switches on the controller. It also allows access to
the On and Off buttons that operate the ice machine.
Sometimes access to the switches should be limited
to prevent unauthorized operation. For that purpose
a fixed panel is shipped in the hardware package.
The fixed panel cannot be opened.
To install the fixed panel:
1. Remove the front panel and remove the bezel.
2. Spread the bezel frame open and remove
original door, insert fixed panel into bezel. Be
sure it is in the closed position.
3. Return bezel to panel and install panel on unit.
October 2014
Page 13

Advertisement

Table of Contents
loading

This manual is also suitable for:

C0522C0722C0330C0530C0630C0830 ... Show all

Table of Contents