Commissioning - Bosch Greenstar combi 100 p Installation And Service Instructions For Contractors

Residential gas condensing boiler
Hide thumbs Also See for Greenstar combi 100 p:
Table of Contents

Advertisement

36 | Commissioning

8
Commissioning
1
2
3
19
Fig. 46 Overview of the controls
[1]
Emissions test button
[2]
Service button
[3]
Burner operation indicator lamp
[4]
ON/OFF power switch
[5]
Key pad lock
[6]
ECO button
[7]
Reset button
[8]
Display
[9]
Automatic air vent
[10] Boiler water pressure gauge
[11] DHW thermostat
[12] Safety relief valve discharge hose
[13] Condensate drain hose
[14] Heating return pipe
[15] Cold water
[16] Gas pipe
[17] DHW
[18] Supply pipe
[19] Boiler high limit dial
6720872361 (2017/04)
4
5
6
7
eco reset
18
17
16
8
9
15
14
10
11
12
13
6 720 641 933-25.1O
Greenstar combi 100 p / 151 p

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar combi 151 pZwb42-3a seriesZwb28-3a series

Table of Contents