Bosch Greenstar combi 100 p Installation And Service Instructions For Contractors page 29

Residential gas condensing boiler
Hide thumbs Also See for Greenstar combi 100 p:
Table of Contents

Advertisement

Fig. 29 Vertical venting system (sealed combustion)
Y
2
1
Fig. 30 Vertical venting system (room air only)
Greenstar combi 100 p / 151 p
X
6 720 641 933-07.1O
1
2
Y
1
Fig. 31 Vertical venting system (sealed combustion)
Key to Fig. 29, Fig. 30 and Fig. 31:
[1]
Intake
[2]
Exhaust
X
Greater than 12 inches (305 mm)
Y
Greater than 12 inches (305 mm)
Notes on installation and operation | 29
Y
6 720 641 933-09.2O
X
2
6 720 641 933-10.1O
6720872361 (2017/04)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar combi 151 pZwb42-3a seriesZwb28-3a series

Table of Contents