Bosch Greenstar combi 100 p Installation And Service Instructions For Contractors page 16

Residential gas condensing boiler
Hide thumbs Also See for Greenstar combi 100 p:
Table of Contents

Advertisement

16 | Examples of Installations
120/230 V AC
120/
PZ1
230VAC
N L
N L
3
120 V AC
4
2
N
L
Fig. 7
Wiring
[1]
PCB in wall-mounted gas condensing boiler
[2]
120 V AC mains power (white plug) ( Chapter 7.3, page 34)
[3]
120 V AC, 60 Hz
[4]
System pump
[5]
External system supply temperature sensor for system supply
pipe
[6]
Motorized valve heating zone 1
[7]
Motorized valve heating zone 2
[8]
Motorized valve heating zone 3
[9]
24 V AC transformer
[10] Outdoor temperature sensor
[11] LWCO (Low Water Cut Off, 24V AC Transformer required)
[12] DHW temperature sensor (inside gas condensing boiler)
[13] Optionally connect external system supply temperature sensor
for system supply pipe here (with white plug)
6720872361 (2017/04)
CZM100
4 5 6
3
1
2
3
4
2
1
0
≤ 24 V
T0
VZ1
VZ2
VZ3
24VAC
1 2 1 2
3 4
1 2
3 4
1 2
3 4
1 2
≤ 24 V
PZ2
PZ3
BUS
BUS
BUS BUS
N L
N L
1 2
1 2
1 2 1 2
5
M
M
M
6
7
8
N
L
LS NS
1
CRC100
HC3
1
2
9
24 V AC
120 V AC
24 V AC
B
B
4
2
10
F
A
12
For all accessories not included in the package please refer to the Bosch
Product Catalog.
CRC200
CRC100
HC1
HC2
11
13
0010011806-001
Greenstar combi 100 p / 151 p

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar combi 151 pZwb42-3a seriesZwb28-3a series

Table of Contents