Fitting The Ie Fc Tp Standard Cable 4 X 2 Gp To An Ie Ip 67 Hybrid Connector - Siemens SCALANCE W788-1PRO Operating Instructions (Compact

Hide thumbs Also See for SCALANCE W788-1PRO:
Table of Contents

Advertisement

Available languages

Available languages

Connecting up

4.6 Fitting the IE FC TP standard cable 4 x 2 GP to an IE IP 67 hybrid connector

4.6
Fitting the IE FC TP standard cable 4 x 2 GP to an IE IP 67 hybrid
connector
Procedure
100
Remove the two inner shells of the universal sealing ring
to adapt it to the diameter of the hybrid cable.
Push the bushing, washer, adapted universal sealing
ring and the housing over the cable jacket.
Remove the following lengths of cable jacket and shield
30 mm
braid:
25 mm
25 mm for the power leads
30 mm for the data leads
To achieve good shielding, the shield braid must be alt
least 30 mm long.
Arrange the data leads according to the color codes on
the splice element. The following table shows the
assignment of the data leads.
Wind the shield braid around the data leads. As a result,
the shielding of the cable has contact to the shield plate
of the splice element that will be fitted later.
SCALANCE W788-xPRO/RR / SCALANCE W74x-1PRO/RR
Operating Instructions (Compact), Release 08/2007, A5E00413342-05

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Scalance w788-1rrScalance w788-2proScalance w746-1proScalance w747-1rrScalance w788-2rrScalance w744-1pro ... Show all

Table of Contents