S4048-On Installation; Unpack The S4048-On System; Unpack - Dell Networking S4048 Installation Manual

Hide thumbs Also See for Networking S4048:
Table of Contents

Advertisement

To install the S4048–ON system, Dell recommends completing the installation procedures in the order presented in this chapter.
Always handle the S4048–ON and its components with care. Avoid dropping the system or its field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the S4048–ON and its components. As with all electrical devices of this type, take all the necessary safety precautions
to prevent injury when installing this system.
Topics:

Unpack the S4048-ON system

Rack or cabinet hardware installation
SFP+ and QSFP+ optic installation
System power-up
Unpack the S4048-ON system
NOTE:
Before unpacking the system, inspect the container and immediately report any evidence of damage.
When unpacking the S4048-ON switch, make sure that the following items are included:
One S4048-ON switch
One RJ-45 to DB-9 female cable
Two sets of rail kits, no tools required
One PSU—a second PSU is sold separately
One AC country/region-specific power cord
S4048–ON Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information

Unpack

1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Carefully remove the switch from the container and place it on a secure and clean surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.
16
S4048–ON installation
S4048–ON installation
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents