Commissioning
9.1
In this Chapter
In this chapter
contains notes on commissioning which you should take into account in order to
avoid personal injury or damage to machines.
Note
Since your commissioning phase is determined primarily by your application, we
can only offer you general information, without claiming completeness of this topic.
Always note ...
the information on commissioning in the description of your system elements and
devices.
9.2
Commissioning procedure
Software requirements
To utilize the full functional scope of the CPUs, you require
• STEP 7 V 5.1 or later + SP 4 for the CPUs 31xC, 312, 314 (6ES7314-1AF10-
0AB0), 315-2 DP (6ES7315-2AG10-0AB0)
• STEP 7 V 5.x or later for all other CPUs
Requirements for commissioning
• S7-300 is installed
• S7-300 is wired
• With networked S7-300:
MPI/PROFIBUS addresses are configured
–
The segments are terminated with active terminating resistors
–
S7-300 Programmable Controller Hardware and Installation
A5E00105492-02
9
9-1