System Board - IBM Aptiva 2170 Hardware Maintenance Service Manual

Hardware maintenance service for service level a ibm monitors 2235; 2236; 2237
Table of Contents

Advertisement

System Board

Remove all adapter cards.
Disconnect all cables connected to the system board. Note the location and
orientation of all cables.
Remove the screws securing the system board to the chassis.
Lift the system board to remove from chassis.
Remove memory (DIMM) if applicable.
Remove processor if necessary.
NOTE: System Board Installation
Before reinstallation, position the housing on its side. When installing a new
system board, push the board to the rear and align it with the front locating
pin. Visually verify that the board is aligned properly, then press the board
down.
Be sure to reinstall the processor, DIMMs, I/O port bracket onto the new
system board if applicable.
After installing the system board, secure with original screws.
Change all jumper settings to match those of the original board.
Reinstall other components into the machine i.e. drives, power supply,
cables, etc.
Upgrade the BIOS version on the new system board using the BIOS
upgrade utility.
Change the Machine Type and Serial Number in the BIOS to match the
original planar BIOS settings.
Reboot the system and run the Setup Utility.
112

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aptiva2171Aptiva 2172

Table of Contents