Z-Release Cable And Gas Spring Adjustment - GE LOGIQ 9 Technical Manual

Hide thumbs Also See for LOGIQ 9:
Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2294854-100, R
IRECTION
Section 6-5

Z-Release Cable and Gas Spring Adjustment

The operator panel can move up and down (Z direction). A gas spring in the scanner provides a counter
force to "balance" the weight of the operator panel and allows for positioning with minimal effort. A lever
on the main handle has a cable (similar to a bicycle cable) that provides the release for the gas spring.
This cable has one end attached to the release lever and the other end attached to the mechanism on
the gas spring piston.
6-5-1
Time Required
Approximately 1 person for 1 hour plus travel.
6-5-2
Tools
Phillips screwdriver
10mm open-end wrench
Two (2) small slotted screwdrivers
Needle-nose pliers
Small ruler
Large slotted screwdriver
3mm Allen wrench
6-5-3
Preparations
DANGEROUS VOLTAGES ARE PRESENT IN THIS EQUIPMENT. COMPLETELY
DANGER
POWER OFF AND SHUTDOWN THE SCANNER BEFORE SERVICING.
1.) Power Off / Shutdown the scanner as described in
page
6-6
PROPRIETARY TO GE
3
EVISION
Select the movie camera icon to view the video of the z- release
cable and gas spring adjustment procedure.
4 minutes and 47 seconds
4-3.
Section 6-5 - Z-Release Cable and Gas Spring Adjustment
LOGIQ™ 9 P
Section 4-3-2 "Power Off / Shutdown" on
M
ROPRIETARY
ANUAL

Advertisement

Table of Contents
loading

Table of Contents