Unpacking The Boxes - Sony MVS -8000X Quick Setup Manual

Table of Contents

Advertisement

Shotbox™ or a Device Control Module, they will be shipped separately and must be
installed by the end user.
CCP-9000 Series panels come as pre-fabricated units in their own boxes.
6. Menu Panel (if purchased)
7. SWC-50xx cables (interconnects between SCU and panel)
8. External module adapters for the control panel (MKS-8075A or MKS-8076)
9. Ethernet Switch Kit (if purchased)
The MVS system requires three discreet, private, LANs to operate. Typically a kit
consisting of two rack-mount Ethernet switches and Ethernet cables, is purchased with
the system. The third LAN simply uses a crossover cable and doesn't require a
dedicated switch.
10. MVS Menu Arm (if purchased)
11. Rack Rails
12. Power Cords
13. Aux Buss Remotes (if purchased)
14. Router Interface Items
If you purchased a third-party router interface, you will receive four additional boxes
including a HKSP-R80 (controller), PFV-SP3100 or PFV-SP3300 (card cages for controller),
HK-PSU01 (backup PSU) and RMM-10 (rack rails).

Unpacking the boxes

Be careful to follow any directions and warnings on the exterior of the individual boxes to avoid damage
to your product. Also, please do not discard anything from the boxes until the ICO and training have
been completed.
Boxes that typically have extra items:
1. Control Panel
a. The roller-ball for the trackball module is not shipped installed as it can damage the
module. It will need to be installed by unscrewing the outside Z-Ring and dropping the
ball into the hole. Please tighten the Z-Ring when finished.
b. Button Puller. This item is required to remove the buttons from the control panel.
Attempting to remove the buttons without using this tool (i.e. using pliers) can result in
damage to the button which is NOT covered under warranty.
c. Additional Button labels. There are many sheets of additional button labels in a plastic
package. These will be needed during your ICO and operator training. DO NOT
DISCARD!
d. Terminating resistor for the reference loop connector.
e. Trackball overlay for device control.
i. This is only needed if a jog/shuttle module has not been installed in the control
2. Ethernet Switch Kit (if purchased)
a. TWO Ethernet Switches (one for Control LAN, one for DATA LAN – the PERIPHERAL LAN
use a crossover cable and does not require a dedicated switch)
b. 3x 100 feet length of Ethernet Cable
c. Crossover adapter and short cable for PERIPHERAL LAN
3. Switcher, DME, SCU and DCU Chassis
a. Terminating resistor for the reference loop connector
panel. If this overlay is needed, it is simply set on top/around the buttons of the
trackball module.
pg. 11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mvs-7000x

Table of Contents