Final Checks (With The Burner Working) - Riello RS 300/E LN Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

5.8

Final checks (with the burner working)

 Open the control limit operation
 Open the high limit operation
 Rotate the maximum gas pressure switch knob to the mini-
mum end-of-scale position
 Rotate the air pressure switch knob to the maximum end of
scale position
 Rotate the maximum oil pressure switch at the minimum of
the scale
 Switch off the burner and disconnect the voltage
 Disconnect the minimum gas pressure switch
 Rotate the minimum low oil pressure switch at the maximum
of the scale
 Cover the QRI flame detector
Make sure that the mechanical locking systems on
the different adjustment devices are fully tightened.
WARNING
20008423
Start-up, calibration and operation of the burner
32
The burner must stop
The burner must stop in lockout
The burner must not start
The burner must stop in lockout due to firing failure
GB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs 400/e lnRs 500/e ln

Table of Contents