Siemens c62 Service Manual page 21

Gsm phase 2+, triple-band - egsm 900 / gsm 1800 / gsm 1900, gprs
Hide thumbs Also See for c62:
Table of Contents

Advertisement

S I E M E N S
C62 Level 2 Service Manual
Step 24
Place the antenna assembly in a small angle
to the top of the phone first.
Step 26
Place the battery into the B-cover cavity as
shown and push down into place.
Copyright © Siemens Pte Ltd.
All Rights Reserved
ICM MP CCQ SLI RHQ
P T E L T D
20 of 47
Step 25
Push the antenna assembly at the same
time forward and downwards from the top of
the antenna cover to lock it into place.
Step 27
Slide the battery cover upwards from the
lower end of the phone until the cover locks
into place.
C62 Level 2 manual V1.1
Internal Use Only

Advertisement

Table of Contents
loading

Table of Contents