Siemens c62 Service Manual page 20

Gsm phase 2+, triple-band - egsm 900 / gsm 1800 / gsm 1900, gprs
Hide thumbs Also See for c62:
Table of Contents

Advertisement

S I E M E N S
C62 Level 2 Service Manual
Step 18 (Receiver)
Take a new receiver and mount it.
Step 20
Then lay down the lower part of the PWB.
Step 22
Place the B-cover assembly onto the top of
the PWB and align the B-cover to the A-
cover. Check that the B-cover housing is
ok and all the components are in their
places.
Copyright © Siemens Pte Ltd.
All Rights Reserved
ICM MP CCQ SLI RHQ
P T E L T D
19 of 47
Step 19
Place the PWB onto the A-cover by laying
down the top part first.
Step 21
Ensure the correct alignment with the pins
in the A-cover and the corresponding holes
in the PWB.
Step 23
Place the five (5) screws in the holes and
tighten in the order shown, 1 first and 5 last.
Set torque to 20 Ncm.
C62 Level 2 manual V1.1
Internal Use Only

Advertisement

Table of Contents
loading

Table of Contents