Gear Assembly P2; Gear Assembly P3; Base Assembly P2; Base Assembly P3 - Sanyo VHR-M262EV Service Manual

Table of Contents

Advertisement

DECK MECHANISM DISASSEMBLY
Gear assembly P2 Hole
Gear assembly P3 Hole
Lever spring Boss
29. Gear assembly P2 (Fig. A-8-1)/
Gear assembly P3 (Fig. A-8-2)/
1) Just lift the Gear assembly P2 up.
2) Just lift the Gear assembly P3 up.
NOTE
When reassembling, align the two Holes of the Gear assem-
bly P2 and P3 in a straight line after confirmation whether the
Gear Sector Hole(A) and the Plate Slider Hole(B) are aligned
or not as Fig.
Gear sector Hole(A)
Plate slider Hole(B)
(B)
Chassis

Base Assembly P3

(Fig. A-8-4)
Fig. A-8
30. Base assembly P2 (Fig. A-8-3)/
1) Move the Base assembly P2 in direction of arrow(A)
along the Guided Hole of the Chassis and disassemble it
on bottom side.
2) Move the Base assembly P3 in direction of arrow(B)
along the Guided Hole of the Chassis and disassemble it
on bottom side.
Place the Mechanism face down, or return to original
position.

Gear Assembly P3

(Fig. A-8-2)

Base Assembly P2

(Fig. A-8-3)
Base assembly P3 (Fig. A-8-4)

Gear Assembly P2

(Fig. A-8-1)
(A)
4-10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents