Loading Motor Assembly And Worm Gear Assembly; Mechanism Uu - Sanyo FISHER V95I Manual

Table of Contents

Advertisement

3-8. LOADING MOTOR ASSEMBLY AND
2)
3)
4)
WORM GEAR ASSEMBLY
(See Fig.3-8-1)
Refer to section 3-2 and remove the mechanism unit.
Remove
the soldering
on the lead wires@) of the
loading motor assembly from the MC-1 PWB assembly.
When you do this, be careful not to let the soldering
iron touch any other parts.
Press the clamp@,
and remove the loading motor
assembly @ and the damper@. Be careful not to exert
too much force on the clamp @).
Remove the worm
gear assembly©@). To maintain
performance,
do not dis-assemble
the worm
gear
assembly ©).
ASSEMBLY NOTES:
1.
2.
Check
that the clamps@ and®©
are securing
the
loading motor assembly.
@Worm gear assembly
positive
<— 3)Clamp
Fig.3-8-1
3-9. PINCH ROLLER PRESSURE
MECHANISM
3-9-1. PINCH ROLLER LEVER ASSEMBLY
1)
2)
(See Fig.3-9-1)
Remove
the clamp @, then
remove
the pinch lift
mounting @.
Remove the spring @), then remove the pinch roller
lever assembly@ off the pinch lift mounting®. Before
you do this, align the Indentation® on the pinch roller
lever assembly @ with the clamp © on the pinch lift
mounting @.
ASSEMBLY NOTE:
1.
Be careful to keep the surface of the pinch roller free
of dust and dirt.
(Pinch roller lever
@Spring
assembly
|
@)Pinch lift mounting
©Clamp
cig: ge — YClamp
Fig.3-9-1

Advertisement

Table of Contents
loading

Table of Contents