Replacement Procedures
NOTE: Apply the silicon grease enough to cover the chip surface using the special
5. Install the CPU heat sink and heat sink holder and secure them with the following
6. Connect the Heat sink cable to the connector on the system board
NOTE: When securing the heat sink holder, be sure to secure the screws in the order of
Satellite U300 and Satellite Pro U300 Maintenance Manual (960-Q08)
Downloaded from
www.Manualslib.com
applicator.
Figure 4-29
screws along 1 to 6.
M2.0×3.0 BIND screw
the number marked on the holder.
manuals search engine
Applying silicon grease
x6
49