Maintenance

MAINTENANCE INSTRUCTIONS

It is recommended that you check the following items at
least every six months and at the beginning of every
swimming season.
1. Examine the venting system. Make sure there are no
obstructions in the flow of combustion and
ventilation air.
2. Visually inspect the main burner and the hot surface
ignitor. The normal color of the flame is blue. When
flame appears yellow, burners should be inspected
and cleaned. Check ignitor for damage.
3. Keep the heater area clear and free from
combustibles and flammable liquids.
Figure 21.
ENERGY SAVING TIPS
1. If possible, keep pool or spa covered when not in
use. This will not only cut heating costs, but also
keep dirt and debris from settling in the pool and
conserve chemicals.
2. Reduce the pool thermostat setting to 78° F. or
lower. This is accepted as being the most healthy
temperature for swimming by the American Red
Cross.
3. Use an accurate thermometer.
4. When the proper maximum thermostat settings have
been determined, tighten the thermostat knob
stopper.
SPRING AND FALL OPERATION
If the pool is being used occasionally, do not turn the heater
completely off. Set the thermostat down to 65° F. This
WINTER OPERATION
If the pool won't be used for a month or more, turn the
heater off at the main gas valve. For areas where there is
no danger of water freezing, water should circulate through
the heater all year long, even though you are not heating
your swimming pool. The MiniMax NT Standard should
not be operated outdoors at temperatures below 0° F. for
propane and -20° F. for natural gas. Where freezing is
P/N 472032
STANDARD

Pressure Relief Valve

In some installations, a pressure relief valve (PVR) is
required on the
MiniMax NT
Standard. To install
a PRV, carefully drill
a 3/8 in. hole in
center of 3/4 in.
NPT port (on main
header) being
careful to drill only
thru wall at bottom
of 3/4 in. NPT port
Figure 22.
and no deeper—
now thread in the 3/4 NPT PRV. NOTE: (A.S.M.E.
version varies from illustration. It is of bronze
construction, and is supplied with the A.S.M.E. Section
IV, pressure relief valve pre-installed at factory.) Test the
relief valve at least once a year by lifting up lever.
5. Set time clock to start circulation system no earlier
than daybreak. The swimming pool loses less heat at
this time.
6. For pools that are only used on the weekends, it is
not necessary to leave the thermostat set at 78° F.
Lower the temperature to a range that can be
achieved easily in one day. Generally, this would be
10° F. to 15° F., if pool heater is sized properly.
7. During the winter or while on vacation, turn the
heater off.
8. Set up a regular program of preventative
maintenance for the heater each new swimming
season. Check heat exchanger, controls, burners,
operation, etc.
will keep the pool and the surrounding ground warm
enough to bring the pool up to a comfortable swimming
temperature in a shorter period of time.
possible, it is necessary to drain the water from the heater.
This may be done by opening the drain valve, located at
the inlet/outlet header (see Figure 22.), allowing all water
to drain out of the heater. It would be a good practice to
use compressed air to blow the water out of the heat
exchanger. (See additional notes under Important Notices
in Introduction.)
24
FOR PRV
INSTALLATION
DRILL THRU
THE NPT PORT
Rev. A 1-2-02