Section Vi. Maintenance; Maintenance Instructions; Pressure Relief Valve; Energy Saving Tips - Pentair Pool Products MiniMax 200 Operation & Installation Manual

Pool & spa heaters
Table of Contents

Advertisement

Available languages

Available languages

Section VI. Maintenance

Maintenance Instruction
It is recommended that you check the following items at
least every six months and at the beginning of every
swimming season.
1. Examine the venting system. Make sure there are no
obstructions in the flow of combustion and
ventilation air.
2. Visually inspect the main burner and the hot surface
ignitor. The normal color of the flame is blue. When
flame appears yellow, burners should be inspected
and cleaned. Check ignitor for damage.
3. Inspect the heat exchanger for soot. Clean as
necessary.
4. Remove burner tray and clean burners and main
burner orifices.
5. Keep the heater area clean and free from
combustibles and flammable liquids.
6. Check wire ends and wire connections. They should
be clean and tight.
7. Check the gas pressure (supply and manifold) as
described in this manual.
STANDARD
Figure 28.

ENERGY SAVING TIPS

1. If possible, keep pool or spa covered when not in
use. This will not only cut heating costs, but also
keep dirt and debris from settling in the pool and
conserve chemicals.
2. Reduce the pool thermostat setting to 78° F. or
lower. This is accepted as being the most healthy
temperature for swimming by the American Red
Cross.
3. Use an accurate thermometer.
4. When the proper maximum thermostat settings
have been determined, tighten the thermostat knob
stopper.
REMOVE THE FLOW VALVE ASSEMBLY WHEN DRILLING
THE HOLE TO INSTALL A PRV, OTHERWISE, YOU WILL
DRILL INTO THE VALVE ASSEMBLY.

PRESSURE RELIEF VALVE

In some installations, a pressure relief valve (PRV)
is required on the MiniMax NT Series. To install a PRV,
remove the access
doors, remove
Flow Valve
assembly, then
carefully drill a
3/8 in. hole in
center of 3/4 in.
NPT port (on main
header) being
careful to drill only
through wall at
bottom of 3/4 in.
NPT port and no
deeper—now thread in
the 3/4 in. NPT PRV.
NOTE: (A.S.M.E.
version varies slightly.
It is of bronze
construction, and is
supplied with the
A.S.M.E. Section IV,
pressure relief valve
pre-installed at
factory.)
TSI
Test the relief valve
at least once a year
by lifting up lever.
5. Set time clock to start circulation system no earlier
6. For pools that are only used on the weekends, it is
7. During the winter or while on vacation, turn the
8. Set up a regular program of preventative
CAUTION
than daybreak. The swimming pool loses less heat
at this time.
not necessary to leave the thermostat set at 78° F.
Lower the temperature to a range that can be
achieved easily in one day. Generally, this would
be 10° F. to 15° F., if pool heater is sized properly.
heater off.
maintenance for the heater each new swimming
season. Check heat exchanger, controls, burners,
operation, etc.
30
RELIEF
VALVE
FOR PRV
INSTALLATION
DRILL THRU
THE NPT PORT
REMOVE FLOW VALVE
BEFORE DRILLING
THE NPT PORT
Figure 29.
RELIEF VALVE
TO WINTERIZE,
OPEN DRAIN VALVE
A.S.M.E. VERSION

Advertisement

Table of Contents
loading

Table of Contents