Pioneer PDP-424MV Service Manual page 109

Table of Contents

Advertisement

PDP-424MV/42MVE1 (CLASS B) Wiring Diagram
[Measures to be taken against connector go-through in the CCD PWB]
A problem of connector go-through in the CCD PWB can be caused by inadequate workmanship such that a wiring material
is pinched between the CCD PWB and the shield lid. To eliminate this problem, wiring work should be carried out as specified
below, so that the PV and PM cables are never led to the CCD PWB.
[Model]For North America (Version A only)
[Wiring instructions](Refer to the diagram below.)
(1) Pass the PV and PM cables beneath the CCD PWB.
(2) Fix the PV and PM cables by means of lead clampers.
(3) Push the bush rivet and the connector to check for the freedom from floating.
[Lead clampers to be used]
LEAD CLAMPER(D5.2): 24C00091
PV CABLE
CONNECTOR
(CCD PWB)
BUSH RIVET
LEAD CLAMPER (D5.2)
10-19
PM CABLE
109

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdp-42mve1

Table of Contents