Procedure Connecting Your Field Wiring - Black & Decker d984 Installation Manual

Table of Contents

Advertisement

Step 6
Step 7
Step 6
Step 9
Using appropriate lengths, connect your W801 signal cable
and W802 power cable (use W808 auxiliary power cable
when required) between the signal and power connector
ports at the top and bottom of each housing within the drop
as shown in Figure 21.
Ground each W802 power cable to the housing' s ground
point shown earlier in Figure 18. The grounding lug re-
quires a #I 0 machine screw.
Ground your rack for Drop 2 to the best possible ground fol-
lowing good practices.
Repeat Steps (1) thru (8) above for all remaining drops ac-
cording to plan.
Procedure Connecting Your Field Wiring
Field wiring should be in place before the I/O modules are inserted into the racks.
During installation, the slot to the left of the slot being wired must be empty.
As shown in Figure 25, field wiring is routed through the wire trough to the terminal
block. There are field wiring terminal screws on each terminal block. User field
wiring crosses from the left side into the wire connectors. Each terminal can ac-
cept as many as four #22 AWG wires, as many as two #14 AWG wires, or a single
#I 2 AWG wire. The wires can be solid or stranded.
GMG984-EDK
System Installation
55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E984K984-x8x controllers

Table of Contents